Infratec Projects
Completed 2024PPS Fencing supplied and installed 2292m of security fencing, using timber posts. We also fabricated and installed the associated gates. ...
January 1, 2024Barrier Repair Service - Transmission Gully Expressway
We have been awarded the maintenance package for wire rope and guardrail barriers after completing the installation of these barriers for CPB Heb Joint Venture in 2022. The maintenance is for repair and any new installations of these road safety barriers on the Transmission Gully Motorway. This motorway is 27 kilometres long and is located north of Wellington....
January 1, 2023Boundary Fencing - Peka Peka to Otaki Expressway
The aim of this project is to remove congestion points for through-traffic consisting of 4 lanes and helping to improve journey time reliability through the Kāpiti Coast area, and to increase all safety aspects. This will revolutionise the efficiency of freight and people movements between Wellington heading north. It will greatly assist in facilitating economic productivity and growth in the area. We are working in conjunction with the stakeholders to complete some of the various fencing proje...
January 1, 2023Takitimu North Link - Temporary Guardrail Installation
We have been engaged to carry out part of the work comprised in the Head Contract for the Takitimu North Link project. PPS work to be carried out is for temporary guardrail with either supply and install or install only or removal as required for works located at the Cambridge Road/ Harrison Road intersection, with the length approximately 400m and at SH29 Takitimu Drive, length approximately 920m. Further sections may be added where required....
January 1, 2023Fencing - New Zealand Transport Agency
We have developed a strong commercial relationship with Colliers International and worked alongside them for numerous years. PPS complete repairs and maintenance and installation of new fencing requirements of all types on tenant properties managed by Colliers International throughout the greater Waikato region. ...
January 1, 2023Installation of permanent Safety Barriers (Wire Rope and W-Beam)
The Transmission Gully Motorway is a 27 kilometre long, four lane motorway north of Wellington, New Zealand; and it forms part of the State Highway 1 route. As part of the Northern Corridor, it provides safe, efficient, and reliable travel in and out of the Wellington Region. PPS installed the permanent safety barriers for wire rope and w-beam.Our hydro excavation truck was utilised through this project for the varying ground conditions and safe excavation around utilities and underground servic...
January 1, 2022Supply and Installation of W-section Barriers and the Installation only of Flexible Safety Barriers
The 22km four lane Hamilton by-pass is now open, taking SH1 traffic east of Hamilton City. PPS supplied and installed W-Section road safety barriers and installed flexible safety barriers through five of the seven sectors of the project.Our hydro excavation truck was used on this project for the varying ground conditions, constructing trenches and the use of safe excavation around utilities and underground services....
January 1, 2022Supply and Install Temporary and Permanent Fencing
PPS supplied and installed temporary and permanent fencing, which included flood gates, drain crossings, culvert headwalls, post and rail and cycleway fencing along with the construction of multiple retaining walls and noise walls throughout the project....
January 1, 2022Supply and Install Guardrail Barrier - SH39
The Mangaotama Stream Bridge on SH39, Ngahinapouri required deck and beam replacement and our involvement in this project was removing existing guardrail barriers and supply and install new leading end terminals, w-section and thriebeam transitions connected to the bridge. ...
January 1, 20225km of Post and Rail Fencing - Vineyard Road - Te Kauwhata
The Vineyard Road Subdivision was subdivided in 3 stages and developed into 70 lots of prime lifestyle blocks with rural outlooks. This subdivision is in Te Kauwhata near Rangiriri. PPS fencing have fenced approximately 5km of boundary post and three rail fences throughout the subdivision....
January 1, 2021Fencing and Noise Walls - Mackays to Peka Peka Expressway
The 110 km expressway delivers an important section of the Wellington Northern Corridor, a long awaited and essential upgrade of State Highway 1 north of Wellington. This highway is a valuable link to the lower North Island and key regional destinations. The upgrade was required to provide safe and reliable access to and from New Zealand’s capital and third-largest city. We worked in conjunction with the stakeholders and completed some of the various fencing projects across the expressway whic...
January 1, 2021Supply and Installation of Wire Rope Safety Barriers and Guardrail Barriers
The 15km, four lane Huntly section links the completed Ngaruawahia section at Taupiri with the Ohinewai section north of Huntly town. We are proud to be the first in New Zealand to install the largest volume at one time versus any other project for the approved method of the Wire Rope Safety Barrier Driven socket system. PPS installed wire rope safety barriers along with guardrail barriers on this project....
January 1, 2021T2UH Duplication Project / Trentham - Supply and Installation of Fencing and Gates
PPS worked on the T2UH Duplication Project in Trentham for Kiwi Rail Holdings Limited. PPS was awarded the supply and installation of fencing and gates which consisted of mainly powder coated pool style fencing....
January 1, 2021Fencing - Waikato Expressway/Huntly Section
We worked in conjunction with the stakeholders to have completed some of the various fencing tasks from the beginning of the project right through to completion. PPS were awarded the fencing package of which we installed temporary, permanent, electric, post and rail, deer fencing, drain crossings and flood gates throughout the area on this project....
January 1, 2021Property Boundary Fencing
We worked in conjunction with the stakeholders to complete some of the various fencing projects which currently included temporary fencing and specialised hill country boundary fencing....
January 1, 2020Residential Fencing in Subdivisions - Mike Greer Homes
We worked alongside Mike Greer Homes to assist with their residential fencing requirements at various subdivisions. The main types of fencing include but not limited to, paling fencing, retaining walls and aluminium pool style fencing....
January 1, 2020Fencing and Noise Walls - Cambridge Expressway
The Cambridge 4 lane section of the Waikato Expressway starts south of the existing Tamahere interchange and runs for 16km, it finishes around 2.5km south of Cambridge where it connects with the existing State Highway 1. We worked in conjunction with the stakeholders to complete some of the various fencing projects across the expressway which included residential fencing, noise walls, fall protection barriers and specialised boundary fencing....
January 1, 2020Whirokino Trestle and Manawatu River Bridge
The Fletchers Construction CompanyCompleted 2020The Whirokino Trestle and Manawatū River Bridge are located just south of Foxton on State Highway 1. This project had two structures that required replacing due to their economic lives and were built to outdated standards. Within this project maintenance and upgrades were required of the state highway where PPS were awarded the supply and install of wire rope and W-section road barrier systems....
January 1, 2020Fencing - Transpower Project
The Whakamaru to Brownhill Road transmission line was constructed by Transpower to increase the capacity of the National Grid between the southern Waikato and the city of Auckland. This distance covered more than 186 kilometres to the new Brownhill Road substation near Whitford in south-eastern Auckland. PPS were awarded the fencing contract to fence vast areas along this project. The fencing allowed for access, farm lane ways and large portions included insulated fence lines....
January 1, 2012 Posts 1-19 of 19 | Page